SUNSYNK 48V,5.5KW
$1,750.00
TECHNICAL SPECIFICATIONS
BATTERY INPUT DATA
Battery Type Lead acid or Lithium-ion
Battery voltage range 40-60V
Max.Charging Current(V) 120A
Max.Discharging Current(A) 120A
PV STRING INPUT DATA
Max.DC Input Power (W) 6500W
MPPT Range (V) 125-425V
Full Load DC Voltage Range (V) 240-425V
Start-up Voltage (V) 150V
PV Input current(A) 11A +11A
No.of MPPT Trackers 2
AC OUTPUT DATA
Rated AC Output and UPS Power(W) 5000w
Max.AC Power 5500w
AC Output Rated Current (A) 21.7A
Max.AC output Current (A) 25A
Power factor 0.8 leading to 0.8 lagging
- Description
- Reviews (1)
Description
The Sunsynk Hybrid Parity inverter is a highly efficient power management tool that allows the user to hit those parity targets by managing power flow from multiple sources such as solar ,main electrical grids ,and generator ,and then effectively storing and releasing electric power as the utilities require.
INTERACTIVE
- Supporting WI-FI or GSM monitoring.
- Built -in 2 strings of mpp trackers.
- Smart settable 3-stage MPPT charging for optimized battery performance.
- Parallel /multi invert function.
COMPATIBLE
- Compatible with main electrical grid voltages or power generators.
- 220V single phase ,pure sinewave inverter.
- Self consumption and feed -in to the grid.
- Auto restart while AC is recovering.
CONFIGURABLE
- Fully programmable controller.
- Programmable multiple operation modes :on-grid/off-grid &UPS.
- Configurable battery charging -current/voltage based on the applications by LCD setting.
- Configurable AC /solar /generator charger priority by LCD setting.
SECURE
- Overload /over-temperature /short -circuit protection.
- Smart battery charger design for optimized battery protection.












occurce –
I think he got all the paperwork, Cabrera said priligy amazon 18 Agreement was reached in early November between the EU and the IOC on the draft statutes for WADA and on a series of initial policy priorities and responsibilities, which included the following first, responsibility for the determination of an agreed list of banned substances and practices using the current IOC Medical Commission list as its starting point; secondly, the transfer of responsibility for the accreditation of testing laboratories from the IOC to the agency; thirdly, planning and co ordinating out of competition testing with the IFs; fourthly, the board of directors will have equal representation of governmental and sports interests; and, fifthly, that Lausanne will only be a temporary location for the agency